![](/globalassets/0/.es/solar--nature/southill-sc-sk-5862.jpg?width=1280&quality=80)
El Cesar
Statkraft is developing the El Casar photovoltaic project, with a capacity of 322 MWp, located in the province of Toledo (Castilla-La Mancha).
It currently has a network access permit, granted by Red Eléctrica España (REE) and the certificate of acceptance for the AAP/DIA application process, by the Ministry of Ecological Transition and Demographic Challenge. The start of the works is estimated for the second quarter of 2024.